READ AND KEEP THIS MANUAL FOR REFERENCE 45060A Printed in Canada 18-08-2014 Installation and Operation Manual HT-2000 US ENVIRONMENTAL PROTECTIO
HT-2000 Installation and Operation Manual 10 2.2 Zone Heating and How to Make it Work for You Your new HT-2000 wood stove is a space heater, whic
HT-2000 Installation and Operation Manual 11 2.4 The SBI Commitment to You and the Environment The SBI team is committed to protecting the enviro
HT-2000 Installation and Operation Manual 12 3 Fuel 3.1 Materials That Should Not be Burned GARBAGE OF ANY KIND, COAL OR CHARCOAL, TREA
HT-2000 Installation and Operation Manual 13 wouldn’t hold a fire overnight unless they were fed large pieces of hardwood. That is no longer true.
HT-2000 Installation and Operation Manual 14 Wood should be split to a range of sizes, from about 3” to 6” (75 mm to 150 mm) in cross section. Hav
HT-2000 Installation and Operation Manual 15 3.2.6 Judging Firewood Moisture Content You can find out if some firewood is dry enough to burn by u
HT-2000 Installation and Operation Manual 16 4 Operating Your Stove 4.1 Your First Fires Two things will happen as you burn your first few fire
HT-2000 Installation and Operation Manual 17 DO NOT LEAVE THE STOVE UNATTENDED WHEN THE DOOR IS SLIGHTLY OPENED DURING IGNITION. ALWAYS CLOSE THE
HT-2000 Installation and Operation Manual 18 in temperature throughout the day and night. This is normal, and for experienced wood burners these a
HT-2000 Installation and Operation Manual 19 4.3.3 Raking Charcoal Rekindle the fire when you notice that the room temperature has fallen. You wil
HT-2000 Installation and Operation Manual 2 THANK YOU FOR CHOOSING THIS DROLET WOOD STOVE As one of North America’s largest and most respected wo
HT-2000 Installation and Operation Manual 20 4.3.5 Turning Down the Air Supply Once the firewood, firebox and chimney are hot, you can begin to
HT-2000 Installation and Operation Manual 21 4.3.6 Building Different Fires for Different Needs Using the air control is not the only way to matc
HT-2000 Installation and Operation Manual 22 4.3.6.4 Maximum Burn Cycle Times The burn cycle time is the period between loading wood on a coal be
HT-2000 Installation and Operation Manual 23 5 Maintaining Your Wood Heating System 5.1 Stove Maintenance Your new stove will give many years of
HT-2000 Installation and Operation Manual 24 5.1.3 Door adjustment In order for your stove to burn at its best efficiency, the door must provide a
HT-2000 Installation and Operation Manual 25 5.1.4 Replacing the Door Gasket It is important to maintain the gasket in good condition. After a ye
HT-2000 Installation and Operation Manual 26 The gasket must be centred on the edge of the glass. To do this easily, peel back a section of the pa
HT-2000 Installation and Operation Manual 27 more slowly. Your new stove has the right characteristics to help you to burn clean fires with little
HT-2000 Installation and Operation Manual 28 PART B - INSTALLATION 6 Safety Information 6.1 Summary of Installation Cautions and Warnings • THE I
HT-2000 Installation and Operation Manual 29 6.2 Regulations Covering Stove Installation When installed and operated as described in these instru
HT-2000 Installation and Operation Manual 3 Table of content PART A - OPERATION AND MAINTENANCE ... 62 Safety Inform
HT-2000 Installation and Operation Manual 30 7 Clearances to Combustible Material The clearances shown in this section have been determined by te
HT-2000 Installation and Operation Manual 31 Clearances to combustible materials and floor protection
HT-2000 Installation and Operation Manual 32 7.3 Floor protector Your stove has been conceived to prevent the floor from overheating. However, it
HT-2000 Installation and Operation Manual 33 7.4 Reducing Wall and Ceiling Clearances Safely It is often desirable to reduce the minimum installa
HT-2000 Installation and Operation Manual 34 Clearances for shield construction
HT-2000 Installation and Operation Manual 35 7.4.2 Table of Clearance Reduction Percentages Type of shield Clearances may be reduced by these per
HT-2000 Installation and Operation Manual 36 8 The Venting System 8.1 General The venting system, made up of the chimney and the connecting pipe
HT-2000 Installation and Operation Manual 37 To be suitable, a factory-built metal chimney must comply with UL 103 HT (U.S.A.) or ULC S629 (Canada
HT-2000 Installation and Operation Manual 38 8.2.2 Masonry Chimneys The stove may also be connected to a masonry chimney, provided the chimney com
HT-2000 Installation and Operation Manual 39 8.4 The Relationship Between the Chimney and the House Because the venting system is the engine that
HT-2000 Installation and Operation Manual 4 5 Maintaining Your Wood Heating System ... 235.1 Stove Maintenance ...
HT-2000 Installation and Operation Manual 40 8.4.2 Why the chimney should penetrate the highest heated space When it is cold outside, the warm ai
HT-2000 Installation and Operation Manual 41 Some jurisdictions in the United States require that wood stoves have a supply of combustion air from
HT-2000 Installation and Operation Manual 42 8.6.1 Installation of Single Wall Chimney Connector The chimney connector assembly has been called ‘
HT-2000 Installation and Operation Manual 43 The rules below are based on those found in the CSA B365 installation code. Please carefully follow t
HT-2000 Installation and Operation Manual 44 Appendix 1: Installing the Pedestal The pedestal kit must be assembled to the firebox before position
HT-2000 Installation and Operation Manual 45 Appendix 2: Installing Trims Your freestanding Drolet wood stove is equipped with decorative u-shaped
HT-2000 Installation and Operation Manual 46 3- Press the ashtray trim (F) on the upper edge of ashtray lip.
HT-2000 Installation and Operation Manual 47 Appendix 3: Installation and Use of Optional Air Circulation Fan (AC02050), and Thermodiscs (AC02055
HT-2000 Installation and Operation Manual 48 When using the optional fan, allow the stove to reach operating temperature (approximately one hour),
HT-2000 Installation and Operation Manual 49 Appendix 4: Installation of Secondary Air Tubes 1-Starting with the rear tube, lean and insert the r
HT-2000 Installation and Operation Manual 5 8.6 Installing the Chimney Connector ...
HT-2000 Installation and Operation Manual 50 Appendix 5: Baffle Installation 1- Remove the front secondary air tube (A) and its cotter pin (B
HT-2000 Installation and Operation Manual 51 Note that secondary air tubes can be replaced without removing the baffle board. Important Notes:
HT-2000 Installation and Operation Manual 52 Appendix 6: Exploded Diagram and Parts List
HT-2000 Installation and Operation Manual 53 IMPORTANT: THIS IS DATED INFORMATION. When requesting service or replacement parts for your stove, pl
HT-2000 Installation and Operation Manual 54 # Item Description Qty 33 30075 BRASS METAL SCREW #6 X 1/2" QUADREX 4 33 30142 NICKEL ME
HT-2000 Installation and Operation Manual 55 DROLET LIMITED LIFETIME WARRANTY The warranty of the manufacturer extends only to the original consum
HT-2000 Installation and Operation Manual 6 PART A - OPERATION AND MAINTENANCE Please see Part B for installation instructions. 2 Safety Informati
HT-2000 Installation and Operation Manual 7 2 General Information 2.1 HT-2000 Specifications Fuel Type Cordwood Test Standards (safety) ULC
HT-2000 Installation and Operation Manual 8
HT-2000 Installation and Operation Manual 9
Comments to this Manuals